Cloncreen Wind Farm involves an investment by Bord na Móna of over €100m in low carbon electricity generation infrastructure in Co. Offaly.
Turbine delivery is expected to begin in the first quarter of 2022. Cloncreen Wind Farm will consist of 21 V136-3.45 MW Vestas wind turbines in 3.6 MW operating mode which will have an overall tip height of 170m. Within this size envelope, the turbines will have a rotor diameter of 136m and a hub height of 102m.
Gallery
Cloncreen Wind Farm
https://mkoireland.ie/cloncreen-wind-farm/
https://www.eib.org/en/projects/pipelines/all/20190189
RELATED DOCUMENTS (IN THE PUBLIC REGISTER)
- Environmental and Social Impact Assessment (ESIA) – CLONCREEN WIND FARM – Environmental Impact Statement
- Environmental and Social Impact Assessment (ESIA) – CLONCREEN WIND FARM – Ecological and biological surveys (Appendix to EIS)
- Environmental and Social Impact Assessment (ESIA) – CLONCREEN WIND FARM – Environmental Impact Statement – Appendices 7-13
- Environmental and Social Impact Assessment (ESIA) – CLONCREEN WIND FARM – Photomontage (Appendix to EIS)
- Environmental and Social Impact Assessment (ESIA) – CLONCREEN WIND FARM – Construction and Environmental Management Plan (Appendix to EIS)
- Environmental and Social Impact Assessment (ESIA) – CLONCREEN WIND FARM – Research on wind farms and health (Appendix to EIS)
- Environmental and Social Impact Assessment (ESIA) – CLONCREEN WIND FARM – Information about electric magnetic fields (Appendix to EIS)
- Environmental and Social Impact Assessment (ESIA) – CLONCREEN WIND FARM – Bird studies (Appendix to EIS)
- Environmental and Social Data Sheet (ESDS) – CLONCREEN WIND FARM