Cloncreen Bog and Wind Farm

Cloncreen Wind Farm involves an investment by Bord na Móna of over €100m in low carbon electricity generation infrastructure in Co. Offaly.

Turbine delivery is expected to begin in the first quarter of 2022. Cloncreen Wind Farm will consist of 21 V136-3.45 MW Vestas wind turbines in 3.6 MW operating mode which will have an overall tip height of 170m. Within this size envelope, the turbines will have a rotor diameter of 136m and a hub height of 102m.

Gallery

Cloncreen Wind Farm

https://mkoireland.ie/cloncreen-wind-farm/

https://www.eib.org/en/projects/pipelines/all/20190189

RELATED DOCUMENTS (IN THE PUBLIC REGISTER)

RELATED DOCUMENTS (IN THE EFSI REGISTER)

Leave a Reply