AIE 04 23 Decision
Request for access to information held by Clare County Council relating to the Wastewater Treatment Plant / discharge licence at Cliffs of Moher Visitor Experience
Results of the effluent sample not in compliance with the ammonia licence limits set down in WP 151
Results of effluent samples taken in 2021 were in compliance
Results of the effluent sample not in compliance with the ammonia licence limits set down in WP 151
Results of the effluent sample not in compliance with the ammonia licence limits set down in WP 151
The final effluent results from the 27th of April were non-compliant as per contract conditions for BOD, Ammonia and Total Phosphorus.
The final effluent results from the 17 th of May were non-compliant as per contract conditions for Ammonia and Total Phosphorus.
The final effluent results from the 16 th of June were non-compliant as per contract conditions for Total Phosphorus and pH
The final effluent results from the 13 th of July were non-compliant as per contract conditions for Total Phosphorus
The influent results for October 4th showed that the Incoming wastewater was not in compliance with the plant design specification for BOD, Suspended Solids, Ammonia and Total Phosphorus which was in excess of design criteria.
The final effluent results from the 4th of October show that Total Phosphorus was not in compliance as per
contract conditions.
The influent results for January 3rd showed that the Incoming wastewater was not in compliance with the plant design specification for BOD, Suspended Solids, Ammonia and Total Phosphorus which was in excess of design criteria.
The final effluent results from the 3 rd of January show that Total Phosphorus was not in compliance as per contract conditions.
The influent results for January 31st showed that the Incoming wastewater was not in compliance with the plant design specification for BOD, Suspended Solids and Total Phosphorus which was in excess of design criteria.
The final effluent results from the 31 st of January show that Total Phosphorus was not in compliance as per contract conditions.
The influent results for March 1 st showed that the Incoming wastewater was not in compliance with the plant design specification for BOD, Suspended Solids and Total Phosphorus which was in excess of design criteria.
The final effluent results from the 1 st of March show that Total Phosphorus was not in compliance as per contract conditions.
The influent results for April 12th showed that the Incoming wastewater was not in compliance with the plant design specification for BOD, Ammonia and Total Phosphorus which was in excess of design criteria.
The final effluent results from the 12 th of April show that Total Phosphorus and Ammonia was not in compliance as per contract conditions.
The influent results for May 25th showed that the Incoming wastewater was not in compliance with the plant design specification for BOD, Suspended Solids, Ammonia and Total Phosphorus which was in excess of design criteria.
The final effluent results from the 25 th of April show that Total Phosphorus and Ammonia was not in compliance as per contract condition
Magheramore Beach Development – Planning Application Documents (Wicklow)
Paddy McKillen jnr
Integrated Tourism / Leisure / Recreations (ITLR) Complex
Planning Application




Application Documentation
Planning Report
Architect Design Report
Flood Risk Assessment
Hydrogeological Investigation and Well Testing at Magheramore, Co Wicklow
Sample Objection
Traffic & Transport Assessment
Media
https://www.greystonesguide.ie/magheramore-beach-gets-pimped/
https://afloat.ie/port-news/dun-laoghaire-news/dun-laoghaire-baths/itemlist/tag/Magheramore%20Beach
Curlew Wintering – Conservation Campaign
https://www.change.org/p/stop-the-destruction-of-the-curlew-wintering-grounds-at-magheramore