Bord Bia inspections/audits, pig farm, Longford

Under the AIE Regs to request details of Bord Bia inspections, audits or other visits to the following
site: Ballinalee Pig Farm, Longford

Please include dates of audits, inspections or other site visits for 2023-2024

Please include related reports, including any site photographs, notes or other reports for the period
2023-24.

For the purposes of this request please include any records for the site related to the Bord Bia Pigmeat
Quality Assurance Scheme (PQAS).”

Schedule of records refused

Please see below a list of records related to this decision:

PQAS Rev 4.1 including Scheme rules

Audit Records Including:

Opening and closing declarations

Audit report

Photos

ECR/Cert Meeting record (decision and dates)

AIE Request: Bord Bia records on meetings to establish a new body to tackle poor public perception of farming

Bord Bia Decision

Schedule of Records

Full Decision

Redacted records

AIE Request: EPA and Bord Bia meetings on the subject of “Origin Green”

Scope of request

Schedule of records

All Ireland Pollinator Plan 2021-2025

Origin Green – Verification Process & Target Scoring Guide

Food Waste Target Guidance

Bord Bia’s Origin Green and EPA National Priority Sites

Sites are placed on the EPA National Priority List if they fail to adhere to their licence conditions and, as a consequence, are posing a risk to the environment. The NPS contains facilities with the poorest compliance and environmental performance records so far this year.

Key Issues
• Inadequate operation of waste water treatment plants
• Inadequate control over surface water discharges
• Breaches of Emission Limit Value

Sample National Priority Site Licence Number / Organisations
P1051 North Cork Creameries
W0291 Forge Hill Recycling Unlimited Company
P0812 Arrow Group Limited
P0801 Tipperary Co-operative Creamery Limited
W0211 ERAS ECO Limited
P0986 Timoleague Agri Gen Limited

Impact on Water Quality
40 EPA licensed sites are significant pressures on water quality – i.e. risk of failing to meet Water Framework Directive water quality standards
▪ 11 are in the food and drink sector
▪ 5 of these are in Origin Green
▪ 3 more pending membership approval

Some sites have prosecutions pending yet still remain in Origin Green

Engagement with Bord Bia
EPA met with Bord Bia in 2022 and 2023 and changes have been made to the scheme criteria
• Sites that don’t notify BB of their inclusion on the NPS face suspension from the scheme
• Sites wont be entitled to Gold Membership if they have been prosecuted in the previous year
• Non-compliance with licence does result in some points reduction
• Agreed that EPA would engage with BB and their verifiers in the future

Further work needed as EPA concerned that sites in the scheme can be an EPA enforcement priority and have significant compliance issues

AIE Request, 10/10/2023

Under the AIE Regs to request details of meetings between EPA and Bord Bia on the subject of “Origin Green” to cover

Dates of meetings

Attendees

Agendas / Minutes

Copies of any presentations / reports provided as part of the meetings

For the purposes of this AIE please include meetings in the Years 2022-23