Volume 4 – Regional Biosolids Storage Facility
Part A: Report
Part B: Appendices
- 1.6MBEIAR Volume 4 Part B Table of Contents
- 114.7KB3A RBSF Receptors List
- 120.3KB6A Criteria for Ecological Evaluation
- 313.2KB7A Waste Management Plan RBSF
- 133.7KB8A Air Quality Standards
- 127.7KB8B Dust Minismisation Management Plan
- 201.8KB9A Acoustic Glossary
- 155.3KB9B Noise & Vibration Management
- 1.8MB10A Odour contours
- 120.3KB11A Record of Monuments
- 105.9KB11B Sites and Monuments Record
- 139.9KB11C Archaeological Investigations
- 4.1MB14A Photomontages
- 35.4MB14B Glint and Glare Assessment
- 1.0MB17A Outline CEMP
Part B: Regional Biosolids Storage Facility
- 3.0MB EIAR Volume 5 Part B Table of Contents
- 8.3MB Y17702-PL-001-General Site Location Plan
- 1.0MB Y17702-PL-002 -Site Location Map
- 697.4KB Y17702-PL-003 -Existing Site Layout
- 6.3MB Y17702-PL-004 -Proposed Site Layout
- 1.9MB Y17702-PL-005 -Existing Buildings to be Demolished (Elevations & Plan)
- 677.8KB Y17702-PL-006-Proposed Ancillary Buildings – Elevations, Plans & Typical Cross Sections
- 590.5KB Y17702-PL-007-Storage Building A – Roof Plan & Elevations
- 1.1MB Y17702-PL-008 – Storage Building A – Plans, Elevations & Cross Sections
- 586.1KB Y17702-PL-009-Storage Building B – Roof Plan & Elevations
- 1.1MB Y17702-PL-010-Storage Building B – Plans, Elevations & Cross Sections
- 7.1MB Y17702-PL-011 -Landscape Layout
- 4.1MB Y17702-PL-012 – Contiguous Elevations
- 5.0MB Y17702-PL-013 – Proposed Road Layout & Markings
- 3.4MB Y17702-PL-014 – Junction Layout, Lamp Standard & Typical Road Details
- 9.8MB Y17702-PL-015 -Surface Water Drainage Layout
- 1.6MB Y17702-PL-016 – Surface Water Drainage Typical Details
- 5.1MB Y17702-PL-017 – Foul Drainage Layout
- 616.1KB Y17702-PL-018 – Foul Pumping Station – Plan & Section
- 2.6MB Y17702-PL-019 – Manhole, Trench Backfill and Bedding Typical Details
- 9.1MB Y17702-PL-020 – Watermain Layout
- 5.5MB Y17702-PL-021 – Watermain Typical Details
- 819.4KB Y17702-PL-022 – Odour Control Unit Plan and Elevation
- 5.1MB Y17702-PL-023 – Electricity & External Lighting Layout
- 820.3KB Y17702-PL-024 – Site Development Details
- 548.8KB Y17702-PL-025 – Weighbridge Details and M&E Control Room Plan & Sections
- 633.7KB Y17702-PL-026 – Construction and Permanent Information Sign
- 5.3MB Y17702-PL-027 – Proposed Site Layout Overlaid with Services
Ringsend Wastewater Treatment Plant Upgrade Project – Environmental Impact Assessment Report
Volume 4 – Regional Biosolids Storage Facility
Part A: Report (June 2018)
The GDDP (ABP 301908) and Ringsend WWTP upgrade (ABP 301798) were connected in their respective planning applications to ABP through the RBSF. The RBSF was to facilitate the storage of biosolids from the Rinsgend WWTP and the proposed Greater Dublin Drainage Clonshaugh WWTP. As the GDDP and RBSF planning was quashed and remitted back to the Board, what way does this leave the Ringsend WWTP upgrade and the RBSF? It is my understanding that the RBSF now has not got planning and can not progress. I stand to be corrected on this. There is also in my opinion a question on whether the Ringsend WWTP upgrade has planning, as the RBSF section of the application is now quashed.