- Final Option Appraisal Report – Non Technical Summary (November 2016)
- Final Option Appraisal Report – Full Report (November 2016)
- Executive Summary
- Introduction
- Remaining Viable Options
- Preliminary Options Appraisal Report (POAR) – Public Consultation
- Interim Demand Review and Phasing of Supply
- Source Abstraction Regime
- Appraisal of Source Impact
- Economic Appraisal
- Preferred Scheme
- Community Benefit Opportunities
- Preferred Scheme – Infrastructure Sites
- Preferred Scheme – Transmission Pipeline
- Concluding Statement
- Next Step
- Schedule of Drawings
- Appendix A Interim Midlands and GDA Water Resource Plan
- Appendix B Hydrodynamic and Water Quality Modelling Report
- Appendix C Cost-Benefit Analysis of Water Supply Projects for the Eastern and Midlands Region
- Appendix D Review of Treatment Technology
- Appendix E Raw Water Abstraction
- Appendix F Water Treatment Plant
- Appendix G Break Pressure Tank
- Appendix H Termination Point Reservoir
- Appendix I Transmission Pipeline
- Appendix J Preliminary Options Appraisal – Consultation Submissions Report
- Water Supply Project E Kennedy Response Summary
- Response to the December 2016 Submission from Emma Kennedy