Fish passage at Castlecor Weir on the Upper River Inny, Co. Meath

Inland Fisheries Ireland (IFI) is the statutory body with the responsibility for the protection, development, and management of the inland fishery resource within the state. As part of their responsibility to manage the fish stocks on the Upper River Inny at Castlecor Weir, it is proposed to hire the services of a consulting firm to prepare an options report for fish pass improvement works at the weir, considering all environmental and engineering circumstances that are present at the site upstream and downstream. IFI wishes to appoint consultants to prepare an options report, based on a number of environmental and technical surveys and using a recognised decision matrix, present a preferred option for fish pass improvement works at Castlecor Weir.

Following the approval of the preferred option, the consultants will then be required to prepare design, calculations, and drawings of the preferred option. These will be sent to the Department of Environment, Climate and Communication, and OPW for licences and approvals. The consultant will be required to prepare a planning application of the preferred option for Meath Local Authority, following the granting of planning permission, the consultant will be required to prepare construction drawings and tender documents for the hire of a construction company. The consultant will also be required to assist IFI in the tender assessment and the appointment of the successful construction company. The consultant will then be required to oversee the construction phase of the preferred option and sign off on the completed project. Please see the attached pricing schedule for more information. The design will take account of cost, constructability, maintenance, disturbance, and other structural and ecological implications. (Please see Scoping and Service Requirement document for further information)

Leave a Reply