Ballinasloe Flood Relief Scheme Site Investigation Works

AA Screening Determination Statement – Site Investigation Works for Ballinasloe Flood Relief Scheme – November 2021
In accordance with Article 6(3) of the EU Habitats Directive (Directive 92/43/EEC) and Regulation 42(1) of the European Communities (Birds and Natural Habitats) Regulations 2011 as amended, the Office of Public Works (OPW) has undertaken Appropriate Assessment screening to assess, in view of best scientific knowledge and the conservation objectives of the European Sites, if the project, individually or in combination with other plans or projects is likely to have a significant effect on a European Site(s).Download
Corrib

AA Determination Statement – Corrib-Clare Bridge Replacement B1_C3-12 on the Corrib Arterial Drainage Scheme – July 2021
The purpose of this Appropriate Assessment (AA) Determination Statement is to provide a statement for the public and relevant bodies to ascertain that an AA has been conducted in accordance with relevant regulations. The purpose is to allow interested parties to assess the competent authority determination.Download

Natura Impact Statement – Bridge replacement Corrib-Clare B1 C3/12
The proposed project is part of the maintenance of the Arterial Drainage Scheme, required as part of maintenance activities under the Arterial Drainage Acts of 1945 and 1995. However, the proposed activities go beyond the scope of standard activities considered in the Arterial Drainage Maintenance Scheme NIS therefore require separate assessment.Download

AA Determination Statement – Corrib-Clare Bridge Replacement B2_C3-4 on the Corrib Arterial Drainage Scheme – July 2021
The purpose of this Appropriate Assessment (AA) Determination Statement is to provide a statement for the public and relevant bodies to ascertain that an AA has been conducted in accordance with relevant regulations. The purpose is to allow interested parties to assess the competent authority determination.Download

Natura Impact Statement – Bridge replacement Corrib-Clare B2 C3-4
The proposed project is part of the maintenance of the Arterial Drainage Scheme, required as part of maintenance activities under the Arterial Drainage Acts of 1945 and 1995. However, the proposed activities go beyond the scope of standard activities considered in the Arterial Drainage Maintenance Scheme NIS therefore require separate assessment.Download

AA Determination Statement – Corrib-Headford Bridge Replacement UB5_C34 on the Corrib Arterial Drainage Scheme – August 2021
The purpose of this Appropriate Assessment (AA) Determination Statement is to provide a statement for the public and relevant bodies to ascertain that an AA has been conducted in accordance with relevant regulations. The purpose is to allow interested parties to assess the competent authority determination.Download

Natura Impact Statement – Bridge Replacement UB5 Corrib-Headford C34
The proposed project is part of the maintenance of the Arterial Drainage Scheme, required as part of maintenance activities under the Arterial Drainage Acts of 1945 and 1995. However, the proposed activities go beyond the scope of standard activities considered in the Arterial Drainage Maintenance Scheme NIS therefore require separate assessment.Download

AA Determination Statement – Corrib-Mask Bridge Replacement B1_CM5-9-1-1 on the Corrib Arterial Drainage Scheme – July 2021
The purpose of this Appropriate Assessment (AA) Determination Statement is to provide a statement for the public and relevant bodies to ascertain that an AA has been conducted in accordance with relevant regulations. The purpose is to allow interested parties to assess the competent authority determination.Download

Natura Impact Statement – Bridge Replacement Corrib-Mask B1 CM5/9/1/1
The proposed project is part of the maintenance of the Arterial Drainage Scheme, required as part of maintenance activities under the Arterial Drainage Acts of 1945 and 1995. However, the proposed activities go beyond the scope of standard activities considered in the Arterial Drainage Maintenance Scheme NIS therefore require separate assessment.Download
Feale
Carroll’s Bridge Apron Repairs

AA Determination Statement – Carrolls Bridge Apron Repairs, Listowel – August 2021
This Appropriate Assessment (AA) Determination Statement is provided for the public and relevant bodies to establish that an AA has been conducted in relation to proposed apron repair works at Carroll’s Bridge (Racecourse Bridge) at Listowel, Co. Kerry, in accordance with relevant regulations.Download

Natura Impact Statement – Carrolls Bridge Apron Repairs, Listowel
The proposed project is part of the maintenance of the Arterial Drainage Scheme, required as part of maintenance activities under the Arterial Drainage Acts of 1945 and 1995. However, the proposed activities go beyond the scope of standard activities considered in the Arterial Drainage Maintenance Scheme NIS therefore require separate assessment.Download
Listowel Bank Slippage. Tree and Scrub Removal. Phase 1 Documentation.

AA and Natura Impact Statement – River Feale Tree and Scrub Removal, Listowel
The proposed project is part of the maintenance of the Arterial Drainage Scheme, required as part of maintenance activities under the Arterial Drainage Acts of 1945 and 1995. However, the proposed activities go beyond the scope of standard activities considered in the Arterial Drainage Maintenance Scheme NIS therefore require separate assessment.Download

AA Determination Statement – River Feale Tree and Scrub Removal, Listowel – January 2021
The purpose of this Appropriate Assessment (AA) Determination Statement is to provide a statement for the public and relevant bodies to ascertain that an AA has been conducted in accordance with relevant regulations. The purpose is to allow interested parties to assess the competent authority determination.Download
Listowel Bank Slippage. Bank Repair Works. Phase 2 Documentation.

AA and Natura Impact Statement – River Feale Bank Slippage, Listowel
Bank Repairs Works – Feale River, Listowel, Co Kerry.Download

AA Determination Statement – River Feale Bank Slippage, Listowel – June 2021
The purpose of this Appropriate Assessment (AA) Determination Statement is to provide a statement for the public and relevant bodies to ascertain that an AA has been conducted in accordance with relevant regulations. The purpose is to allow interested parties to assess the competent authority determination.Download
Killimor / Cappagh

AA Determination Statement – Killimor Bridges Extension and Repair and Embankment E1 Refurbishment – July 2021
The purpose of this Appropriate Assessment (AA) Determination Statement is to provide a statement for the public and relevant bodies to ascertain that an AA has been conducted in accordance with relevant regulations. The purpose is to allow interested parties to assess the competent authority determination.Download

Natura Impact Statement – Killimor Bridges Extension and Repair and Embankment E1 Refurbishment
The proposed project is part of the maintenance of the Arterial Drainage Scheme, required as part of maintenance activities under the Arterial Drainage Acts of 1945 and 1995. However, the proposed activities go beyond the scope of standard activities considered in the Arterial Drainage Maintenance Scheme NIS therefore require separate assessment.Download
Maine

AA Determination Statement – River Maine Sluices SL47, SL143 & SL144 Replacement – July 2021
The purpose of this Appropriate Assessment (AA) Determination Statement is to provide a statement for the public and relevant bodies to ascertain that an AA has been conducted in accordance with relevant regulations. The purpose is to allow interested parties to assess the competent authority determination.Download

Natura Impact Statement – River Maine Sluices SL47, SL143 & SL144 Replacement
The proposed project is part of the maintenance of the Arterial Drainage Scheme, required as part of maintenance activities under the Arterial Drainage Acts of 1945 and 1995. However, the proposed activities go beyond the scope of standard activities considered in the Arterial Drainage Maintenance Scheme NIS therefore require separate assessment.Download
Moy

AA Determination Statement – Moy Bridge Replacement UB1_C46 on the Moy Arterial Drainage Scheme – August 2021
The purpose of this Appropriate Assessment (AA) Determination Statement is to provide a statement for the public and relevant bodies to ascertain that an AA has been conducted in accordance with relevant regulations. The purpose is to allow interested parties to assess the competent authority determination.Download

Natura Impact Statement – Bridge Replacement Moy UB1 C1/46
The proposed project is part of the maintenance of the Arterial Drainage Scheme, required as part of maintenance activities under the Arterial Drainage Acts of 1945 and 1995. However, the proposed activities go beyond the scope of standard activities considered in the Arterial Drainage Maintenance Scheme NIS therefore require separate assessment.Download

AA Determination Statement – Moy Bridge Replacement UB0_C1-42 on the Moy Arterial Drainage Scheme – August 2021
The purpose of this Appropriate Assessment (AA) Determination Statement is to provide a statement for the public and relevant bodies to ascertain that an AA has been conducted in accordance with relevant regulations. The purpose is to allow interested parties to assess the competent authority determinationDownload

Natura Impact Statement – Bridge Replacement Moy UB0 C1/42
The proposed project is part of the maintenance of the Arterial Drainage Scheme, required as part of maintenance activities under the Arterial Drainage Acts of 1945 and 1995. However, the proposed activities go beyond the scope of standard activities considered in the Arterial Drainage Maintenance Scheme NIS therefore require separate assessment.Download
Mulkear Ballymakeogh

AA Determination Statement – Maintenance to Flood Defence Embankments, Ballymakeogh, Newport, Tipperary – September 2021
The purpose of this Appropriate Assessment (AA) Determination Statement is to provide a statement for the public and relevant bodies to ascertain that an AA has been conducted in accordance with relevant regulations. The purpose is to allow interested parties to assess the competent authority determination.Download

Natura Impact Statement – Maintenance to Flood Defence Embankments, Ballymakeogh, Newport, Tipperary
MKO has been appointed to prepare a Natura Impact Statement to allow the competent authority to conduct an Appropriate Assessment of remediation and bank enhancement works at Ballymakeogh, Newport Co. Tipperary.Download
Shannon Town Flood Relief Scheme Ground Investigation Works

AA Determination Statement – Ground Investigation Works for Shannon Town Flood Relief Scheme – April 2021
Pursuant to Regulation 42(11) of the European Communities (Birds and Natural Habitats) Regulation 2011 (as amended), The Office of Public Works, as a Public Authority, has conducted an Appropriate Assessment (AA) of the proposed Ground Investigation (GI) works as part of the Shannon Town and Environs Flood Relief Scheme, Co. Clare. The purpose of this Determination Statement is to allow interested parties to assess the Public Authority determination.Download

Natura Impact Statement – Ground Investigation Works for Shannon Town Flood Relief Scheme
RPS Consulting Engineers have been commissioned to assist in the delivery of the Shannon Town and Environs Flood Relief Scheme (FRS). The objective of this project is the identification, design and submission (for planning consent) of a Flood Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding to the Community of Shannon to a determined Standard of Protection, and to procure, manage and oversee the construction of that Scheme.Download