Bantry Flood Relief Scheme

http://www.bantryfrs.ie/

The project shall comprise up to five stages.

Stage 1: Scheme Development and Design

Assess and develop a viable, cost-effective and sustainable Scheme, to allow the design flood event along the Bantry & Mealagh Rivers and their tributaries without causing flooding of properties, in so doing protecting against flooding from pluvial, fluvial, groundwater, tidal and surge.

Carrying out a Constraints Study to identify the key environmental issues in the study area, which may be impacted upon by possible flood alleviation measures, and/or which may impose constraints on the design and viability of these measures.

Preparation of the Appropriate Assessment Screening Statement.

Public consultation, including Public Information Days. The purpose of the first Public Information Day is to gather information from the public about their experiences of flooding in the Study Area along with their thoughts on possible solutions to the flooding problem and their preferences in this regard.

Development and identification of preferred scheme, informed by:
Multi-criteria assessment of options including environmental assessments
Cost Benefit analysis for the preferred scheme


Stage 2: Planning process

Complete the necessary planning and any other statutory processes, to progress the preferred Scheme through Part 10 Planning under the Planning and Development Act 2000 or confirmation under the Arterial Drainage Act 1945.


Stage 3 – Detailed Design, Confirmation and Tender

Undertaking the detailed design of the final preferred scheme.
Confirmation of the Scheme by the Minister for Public Expenditure & Reform where relevant.
Preparation of Contract Documents and undertaking the procurement of a works contractor to construct the Scheme.


Stages 4 and 5 – Construction and Handover of the Works

A Natural Water Retentions Measure (NWRM) Feasibility Assessment will be undertaken when assessing the solutions to mitigate flooding in Bantry. Where it is feasible for NWRM to contribute to flood reduction in the Scheme Area, or to contribute to the mitigation of the environmental impacts of the Scheme, these measures will be developed as part for the Scheme.

Project area

Culverts Map

South West Catchment Flood Risk Assessment and Management (CFRAM) Study

Further detail is available on www.floodinfo.ie

Parts of Bantry have been identified as being at risk of flooding. The areas at risk in particular follow the path of the Mill River, Alley River and Scart Stream through the town and the Mealagh River to the north of the town.

Bantry is also affect by tidal flooding with coastal areas identified as at risk. There are also problems with the poor structural condition and flow capacity of culverts in the town. One of the significant causes of flooding is high tides entering the local drainage network and causing sewer flooding as well as river flooding from the Bantry Stream and tributaries. Bantry is prone to flash flooding from the numerous small steep rivers that flow through the town.

Map of Bantry Culverts

For more detailed maps of culvert system in Bantry see